7-9 Marine Pde, Manly

This classic seaside apartment block nestled on the shorefront between Manly and Shelley Beach was crying out for remedial works. Years of neglect and the harsh marine environment had led to water leaks in the building and prominent wear and tear to the facade. The MAX Build team were called in to repair the related damage and give the building a facelift in the process.

Our scope of works included replacing window lintels, installing brick cavity flashing, replacing the building's roof, rectification of concrete spalling repair, balustrade replacement, replacing corroded structural beams, upgrading external plumbing stacks, refurbishing the bay windows and installing a protective membrane coating system.