Week commencing 8 August

  • Inspection by consultant/ engineer 
  • Dilapidation of Unit 10
  • Stage 1 and 2 Helifix application/ spalling investigation and repairs
  • Emergency evacuation plan issued
  • 4 floor sections on North Eastern have been opened
  • Exposure of deteriorated reo bars in Level 1 

In the week ahead

  • Helifix ties pilot holes patching 
  • Wall openings above Level 6
  • Deteriorated bracket removal
  • Spalling identification and repairs on North Eastern wall
  • Short drop wall concrete slab/ render repair (Level 2 to 6)
  • Matching brick sampling