Week commencing 15 August

  • Helifix ties pilot holes patching 
  • Wall openings above Level 6
  • Deteriorated bracket removal
  • Spalling identification and repairs on North Eastern wall
  • Short drop wall concrete slab/ render repair (Level 2 to 6)
  • Matching brick sampling

In the week ahead

  • Stainless steel angles installation to wall openings 
  • Biscuit bricks re-installment 
  • brick Pointing to repaired slab levels 
  • New full openings in Level 7 and above for spalling investigation 
  • Propping system to new openings 
  • Confirmation of brick sample choices and brick order