In the week ahead

Stage 7A

  • Render to flat walls
  • Painting flat walls and flashing's
  • Move swing stage Stage 7A to Stage 5
  • Dismounting landing platform and cleaning

Stage 7B

  • Biscuits to openings
  • Brick pointing
  • Painting   

Stage 6

  • Open biscuits to Level 3
  • Slab fixing/spalling
  • Biscuits & brick pointing 
  • Side balconies spall to be opened/cleaned

Roof

  • Vodafone tower scaffold access 
  • Pipes/flashings painting