Week commencing 22 August

  • Helifix ties pilot holes patching 
  • Wall openings above level 6 
  • Deteriorated bracket removals
  • Spalling identification and repairs in the North Eastern Walls 
  • Short drop wall concrete slab/ render repairs (Level 2 to 6)
  • Matching brick samples

In the week ahead

  • Stainless steel angles installation 
  • Dry packing angles 
  • Patching works to Level 6 & 7