Week commencing 5 September

  • Repair mortar application to Level 7, 12, and 13 (long drop)
  • Repair mortar application to all openings on short drop 
  • Measurements for biscuit bricks
  • Biscuit bricks to Level 2 and 3 (long drop)
  • Level 8 concrete slab have been opened 

In the week ahead

  • Biscuit bricks installation - long drop and short drop ]
  • Level 8 concrete slab repairs 
  • Brick pointing - long and short drop